It would be grossly unfair to say that agile methods do not
require any prior design. Agile methods are adaptive, not unplanned or
undisciplined. When the development is based on agile methodology such as SCRUM
and especially, distributed SCRUM, at some point, the need for design document becomes
key to success of sprint delivery with as lesser technical debt as possible.
What are those dcuments and what is the way to deal with creating them?
No comments:
Post a Comment